Home | Contact Info | The Team | Equipment | Major Clients | Testimonals | Gallery

Lifespan Newport Hospital

Hazard Vault Demo
GNS feeder
East wing Emergency Power Breaker Panel

Lifespan R.I. Hospital

APC Switchgear Replacement Phase III
APC Switchgear Replacement Phase II
Boiler Room, 4KV steam turbine generator
Cape Way building, maintenance garage
Potter Bldg monitors/alarms
Laundry feeder
Electrical installation at S.W.P. 2nd floor
6th floor main bldg. electrical upgrade
APC 5th floor
MOC building switchgear replacement
Davol/Hasbro electric room 208v switchgear upgrad
Jane Brown Feeder Relocation

Brown University

Central Heat plant 500 kw generator replacement
Minden Hall/Prince lab systems renewal and upgrade
Replace 11 KV cable
Replace feeder #14 from M.H. 1021-1027
Generators in various buildings
180 George Street, 3 new transformers
Tripping feeders 13 & 14
Cable tags at 147 M.H., transformers and vault
Utility systems renewal and upgrades, 5kv feeder
Emergency replacement of defective cables
Remove & replace 100 KVA transformer
Upgrade Service at 151 & 135 Thayer St.
Fire Alarm system at Rockefeller Library
5 KV vacuum circuit breaker
Wriston Quad-Phase II renovations
LSB Replace Sq. D medium voltage switches
John Carter Library transformer replacement
Bio Med substation
Geo Chem 400 KW generator

Lifespan Miriam Hospital

2nd service feeder and A/B switchgear
Relocate Fain and x-ray feed
Angio/X-ray labs, Chiller expansion, New O.R. HVAC
Cath labs phase I and II
High voltage feeder line
Ambulatory service O.R. fit up
Main H.V. service upgrade and generator replacement
AHU 1, 2 & 11 Air handler unit replacement

National Grid

Pole mounted services, various locations for Gas Division
60 amp meter service for gas pressure monitor-various locations
180 KW generator at Exeter Gas
Cathodic protection
Cumberland 20kw generator
Cumberland LNG KAA Electrical service upgrade and LED lights
Exeter LNG 600 Amp 480V service

FAA

RTR Equipment shelter at T.F. Green Airport
Demo of RTR Antenna Tower at T.F. Green Airport
Engine generator at T.F. Green Airport
Replace 16 VASI foundation-Newport Airport
Replace cable VASI- Newport Airport
Replacement ATCT engine generator at T.F. Green Airport
Upgrade power service to Vortec for air traffic control at T.F. Green Airport

Roger Williams Medical

Emergency power upgrade
Substation replacement
600 amp feed for Chillers
Endoscopy unit
Isolation Panels in operating room 1 & 2
Repair 11 KV switchgear
Electrical installation in x-ray room
600v switchboard
Elmhurst Building 2000 Amp buss duct replacement

VA Medical

Mobile MRI trailer and trailer power
Emergency power to temp emergency room
High voltage distribution system
Emergency upgrade power
Demolition of Bldg 31
Site electrical Ambulatory Care

Solar Farms – Completed National Grid interconnect on medium voltage side

Tanglewood
Dino
Carbide
Tourbillion
Lamp Lighter
Petersen Farm
Forbes


Emergency Standby Generators

Brown University – 400 KW Generator
Pastore Center, Regan Bldg. – 750 KW Generator
Town of Hopkinton – 130 KW Generator
T.F. Green Fire Station – 45 KW Generator
S. Kingstown Salt Pond Pump Station – 52 KW Generator
S. Kingstown Hospital Pump Station – 52 KW Generator
S. Kingstown Waste Water – 510 KW Generator
Warwick Fire Station #3 – 40 KW Generator
Henry Barnard School – 60 KW Generator
Warwick Armory – 175 KW Generator
Stanton Ave Pump Station – 100 KW Generator
Burrillville Hauserfield – 300 KW Generator
Burrillville Police Station/Jesse Smith Library – 100 KW Generator
Middletown Senior Center – 50 KW Generator
State of RI Camp Street – 130 KW Generator
Warren FMS Shop – 60 KW Generator
Brown University Central Heat Plant- 500 KW Generator
URI Memorial Union – 800 KW Generator
National Grid Exeter Gas – 180 KW Generator
Met Life – 2 MEG Generator